The ground loop
Buried tubing that exchanges heat with the earth. It can run in vertical bores, angled bores or horizontal trenches, depending on land, soil & the building's load. The loop design is set after the site assessment, not before.

Geothermal · New installation
A geothermal system moves heat between a building & the ground instead of burning fuel or fighting outdoor air temperature. GeothermalKC plans & installs new systems for homes & commercial buildings, & the GeothermalKC team that digs the loop field installs the system.
Every geothermal system has the same three parts. What changes from project to project is how the ground loop is laid out on the site.
Buried tubing that exchanges heat with the earth. It can run in vertical bores, angled bores or horizontal trenches, depending on land, soil & the building's load. The loop design is set after the site assessment, not before.
Indoor equipment that concentrates heat from the loop for heating in winter & sends heat back into the ground for cooling in summer.
Ductwork, radiant tubing or both, plus thermostats & controls. In a new building these are designed with the system; in an existing one they have to be checked.

The loop layout is set after the site assessment. These drawings show the three common approaches; the right one depends on land area, soil, access & the building’s load.

Loops run straight down in a small footprint. Suited to sites with limited open ground.

Several loops fan out at an angle from a single small excavation, keeping surface disturbance low.

Loops laid in shallow trenches across open ground. Suited to acreage & new construction with room to dig.
A few feet below the surface, the ground stays at a much steadier temperature than the air. The U.S. Department of Energy notes that at around 30 feet down it stays roughly between 50 °F & 59 °F year round.
In winter the system draws heat from that ground & concentrates it for the building. In summer it runs the other way, moving heat out of the building & into the ground. The same equipment does both jobs.
Most ground source systems pump water or an antifreeze solution through plastic pipe in the ground, then pass that heat to the heat pump through a heat exchanger.
A direct exchange (DX) system circulates the refrigerant itself through copper tubing in the ground, so the ground connects directly to the heat pump without a separate water loop.
Each approach has its own requirements for soil conditions, loop layout, equipment & service. Which one suits a project is part of the assessment, & GeothermalKC explains the trade offs for each site rather than promising one answer for every property.

These are assessed before a system is recommended. Some can rule a design out; most just shape it.
Every project is different; this is the usual order.

Project details arrive. GeothermalKC reviews the scope, location & timing.
GeothermalKC explains the consultation agreement & schedules a time.
The ground, access, building & existing systems are evaluated.
Loop layout, equipment & scope, with a written price.
Drilling or trenching, loop placement, backfill & site cleanup.
Heat pump, connections, distribution work & controls.
Start up, checks & an explanation of how to run the system.
Open ground & early planning give the most freedom in loop layout, & the loop can go in before final grading.
Commercial & agricultural buildings where the owner wants steady heating & cooling & plans to keep the building long term.
When ductwork & heating equipment are being replaced anyway, it's the natural time to evaluate geothermal.
Buildings that already have geothermal, & existing buildings without it, are covered on the replacement & retrofit page.
Yes, ground source heat pumps are used in cold climates. Ground temperature a few feet down stays far steadier than air temperature, & the system is sized for the building's heating load. Some systems include supplemental heat for the coldest days; that's part of the design.
It depends on the building's load, the ground & the loop type. Vertical or angled bores need much less surface area than horizontal trenches. The area needed is set during the site assessment.
Both depend on the building, the site & the equipment chosen, so GeothermalKC does not publish prices or savings figures. A written proposal follows the consultation. Past energy bills help show current costs.
The IRS says the federal Residential Clean Energy Credit is not available for property placed in service after December 31, 2025. GeothermalKC does not give tax advice; current incentives are best confirmed with a tax professional & the program directly.
With a consultation request that includes the location, building type & timing. GeothermalKC reviews the project & follows up about the consultation agreement & next steps.

Project consultations
New geothermal installations for homes & commercial buildings. Consultation requests with the location, building type, timing & any plans are the quickest to schedule.