Geothermal · Excavation · Build · Spring Hill, Kansas(913) 205-5848bryan@auorkc.com

Excavation & sitework · Driveways

Driveways, from base to finished drive.

A drive lasts when the subgrade is shaped to shed water & the base is placed & compacted in lifts. GeothermalKC prepares new rural drives, access lanes & equipment pads, then GeothermalKC can finish the surface & build what the drive leads to.

Request Consultation

The part under the gravel

Ruts, potholes & washouts on a gravel drive usually start below the surface: soft subgrade, no crown, or water running across instead of off. Getting the cut, shape & base right is what keeps the top rock in place.

The written scope confirms what is included, such as base material, culvert placement & surfacing, so there are no surprises about who does what.

One company from the first dig to the finished build, with compact excavation equipment suited to tight residential access, for projects across the Kansas City metro & surrounding counties.

Compact track loader beside a freshly graded gravel drive through woods
Representative photo

What the work can include

  • Stripping topsoil & cutting the driveway route
  • Shaping the subgrade with a crown or cross slope to shed water
  • Placing & compacting base rock
  • Ditches or culvert placement where the design calls for them
  • Equipment pads & turnarounds
  • Rough grading the edges

Excavation & build

From the base to what it leads to

A new drive usually serves something new. That can be built on the same project.

Request Consultation
  • Gravel or concrete surfacing
  • Culverts & drainage
  • Garage & shop pads
  • Shops, garages & outbuildings
  • Grading & landscaping along the drive

How a driveway job runs

  1. Consultation request

    Send the route, the length, photos & how the drive will be used.

  2. Site walk

    Soil, drainage, grade & where water crosses the route are checked.

  3. Written scope

    Route, width, base, drainage & surfacing responsibilities are agreed.

  4. Cut & shape

    The route is stripped, cut & shaped to shed water.

  5. Base

    Base rock is placed & compacted, ready for surfacing.

Typical projects & exclusions

Typical projects

  • New rural drives & access lanes
  • Access to building sites & shops
  • Equipment pads & turnarounds

Not included

  • Public road connections that need permits
  • Long commercial roads that need larger equipment

Common questions

Why does my gravel driveway keep washing out?

Usually because water runs across or down the drive instead of off it, or the base underneath is thin or soft. Reshaping the crown, adding ditches or culverts & rebuilding the base address the cause.

Is the surfacing included?

Base material & surfacing, whether gravel or concrete, can be part of the same job. The written scope spells out exactly what is included.

Can an existing gravel driveway be repaired?

Often, yes. Regrading, adding a crown, installing a culvert & rebuilding the base on problem sections can extend the life of an existing gravel drive.

Project consultations

Request a Consultation

Gravel driveways & the build that follows, across the Kansas City metro & surrounding counties. Consultation requests with the location & photos of the site are the quickest to schedule.